Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
playground:testing-addition [2025/03/01 05:35] – rahul | playground:testing-addition [2025/03/01 05:49] (current) – rahul | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | __false__ | + | ====== Safety, Reliability, |
+ | |||
+ | {{ : | ||
+ | {{ : | ||
+ | |||
+ | External link: https:// | ||
+ | |||
+ | Or hyperlinked {{https:// | ||
+ | |||
+ | **Background and Purpose** | ||
+ | |||
+ | The SQRS committee was formed in 2019 as a focus point for issues related to safety at first, expanding later to related questions of quality, reliability and standards in 2021. Its purpose is to provide support for applicants and entrepreneurs, | ||
+ | |||
+ | **Key Duties of the Committee** | ||
+ | |||
+ | * Promote local safety culture in the ISV projects under development. | ||
+ | * Provide guidance to ISV entrepreneurs in the areas of electrical safety, electrical reliability, | ||
+ | * Support aspects of project application and reporting under the committee’s purview. | ||
+ | * Promote technical training and presentations at ISV-related events. | ||
+ | * Develop support material in these areas to help volunteers and others. | ||
+ | |||
+ | **Recent and Ongoing Initiatives** | ||
+ | |||
+ | Questions added to project application and reporting (2021-2022). | ||
+ | |||
+ | Development of support material leveraging the ISV repository. | ||
+ | |||
+ | Support for safety and standards activities at IEEE events, such as keynotes, tutorials and panel sessions at PowerAfrica, | ||
+ | |||
+ | **Contact Information** | ||
+ | |||
+ | Bruno Lequesne : | ||
+ | |||
+ | **Why an SQRS Committee for ISV?** | ||
+ | |||
+ | **//Why safety?// ** | ||
+ | |||
+ | Electrical accidents are relatively rare, compared to other types of accidents (falls, cuts, etc), but are proportionally more deadly. Introducing electricity, | ||
+ | |||
+ | Example of poor quality, failing equipment and the danger it represents (Photo credit: C. Satish) | ||
+ | |||
+ | **//Why reliability?// | ||
+ | |||
+ | Poor quality equipment can doom the best thought-out and executed project. Early failure will lead to disappointment among customers, necessitate unscheduled and possibly costly repairs, and distract a project from an otherwise great growth trajectory. Thinking through quality issues early on and assuring products meet specifications can go a long way in ensuring success. | ||
+ | |||
+ | **//Why quality?// ** | ||
+ | |||
+ | Quality ensures reliability and safety, and as such is an important component of project development and implementation. It is important to ensure good quality in design basis notes, engineering drawings, construction methodology, | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Example of poor quality, failing equipment and the danger it represents (Photo credit: C. Satish) | ||
+ | |||
+ | **//Why standards?// | ||
+ | |||
+ | ISVx operates in parts of the world where standards are sometimes not well established, | ||
+ | |||
+ | These four topics are interrelated: | ||
+ | |||
+ | The committee is always looking for volunteers. We have teams for Africa, Latin America, South Asia and China dedicated to this topic in their respective regions, all looking to grow this activity with motivated volunteers. | ||